
A few weeks ago we learned that the U.S. will be 310 CHAdeMO fast charging stations, 480V AC or DC converters that can be Nissan Leaf up to 80 percent charge to get in 30 minutes to get.
Most of them are designed for large urban areas, but we were intrigued to find that Washington state is about two or three of them are stuck in the country, 120 miles on the scenic side of Route 2 that runs over the Cascade Mountains. It is popular with tourists and electric vehicles becoming more popular in this area, even more so with the best transport tourists to enjoy the trip. For full coverage hit the source link below.
[Source]
Post a Comment